My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70089
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:14 PM
Creation date
11/20/2007 11:12:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981026
IBM Index Class Name
Permit File
Doc Date
9/14/1981
Doc Name
RESPONSES TO PHASE I APPARENT COMPLETENESS REVIEW AND COMMENTS FROM CMLR OF 09/2/81
Section_Exhibit Name
ADDENDUM II
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />• 3. Sediment Pond No. 1 <br />From the design drawing presented, it is obvious that, with any flow'through <br />the emergency spillway, the freeboard requirements of 4.05.6(8)(d), one foot <br />of freeboard under passage of the design event, are not met. This is required <br />of all existing as we 11 as proposed ponds. However, WF has assumed that the <br />peak outflow will be equal to the peak inflow, neglecting any flood attenuation <br />due to storage in the pond. This results in an extremely conservative design. <br />It was also noted that the spillways of this and other ponds were designed <br />using Manning's equation. Spillways more approximate weir flow and the weir <br />equation Q = CLH3/2 is more appropriate for design and provides the advantage <br />of quickly determining depth of flow. <br />Several options are available to WF to show that the existing pond will pass <br />the 25-year event. They are: <br />A. Route the flood through the pond assuming that the gate on the <br />principal spillway is always open. Flow through the principal spill- <br />way will then experience changing control from weir to orifice to, <br />finally, pipe flow. The equations for these flows are given below: <br />1) Weir flow <br />Sharp Crested Weir: 3.3 LH 1 5 = Q <br />where H = head over crest of pipe and <br />. L = circumference of pipe <br />^ 2) Orifice Flow <br />Sharp Edged Orifice: 0.6A (ZgH)'S = Q <br />where H = head over crest of pipe, and <br />A = cross-section area of pipe, and <br />g = gravitational constant 32 fps2 <br />3) Pipe Flow <br />A ( 2gH )0.5 = Q <br />1+Ke+Kb+XcL <br />where Ke = coefficient of entrance loss <br />Kb = coefficient of bend Loss <br />Kc = coefficient of friction loss <br />in general: <br />Ke = 0.9 <br />Kb = 0.5 <br />Kc = 5087 n2/d4/3 <br />= app. 0.22 from 24" CMP <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.