My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70052
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:11 PM
Creation date
11/20/2007 11:11:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 23 Spill Prevention Control and Countermeasure Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PAGE 2 <br />B. A gate valve, provided for drainage, will be opened and <br />resealed by supervisory personnel and the event will be <br />noted and filed on site. <br />7. All delivery of oil to the storage tanks is by motor tank <br />vehicle. Standard operating procedures are designed to prevent <br />overfilling tanks. These include: <br />A. Gauging the tank prior to unloading incoming product to <br />insure sufficient tank capacity to accept delivery. <br />B. Motor tank vehicle drivers stand by unloading vehicles to <br />shut down the unloading operation in case of malfunction <br />or overfill. <br />8. All tanks, piping, valves, impoundments, enclosures, and/or <br />dikes will be inspected by supervisory personnel at the mine site <br />monthly and routinely by operating personnel. If necessary, <br />corrective action will be promptly undertaken. A "Facilities <br />Inspection Form" will be used for all quarterly inspections. A <br />• copy of each report will be filed with the SPCC Plan and maintained <br />at the mine facility for a period of three years. <br />9. The following training procedures will be provided: <br />A. The SPCC Plan will be reviewed with operating personnel at <br />the mine site. <br />B. New employees in the area will be instructed in spill <br />prevention as parC of their training. <br />10. The appropriate surface superintendent/manager will be <br />accountable for oil spill prevention at this facility. <br />11. The original copy of this plan will be kept in the <br />Environmental Office located at the Golden Eagle Mine. A copy of <br />the plan will be posted in the warehouse office. <br />12. Numerous 5 and 55 gallon containers/drums of products are <br />stored for use at all facilities. The number of drums/containers <br />at any one site or at any one time varies considerably. No <br />secondary containment is provided for such containers/drums since <br />they are new, turnover is generally rapid and the likelihood of <br />spills is remote. Some smaller portable tanks with products may be <br />stored at various locations without secondary containment. These <br />• smaller quantities are monitored routinely by operating personnel <br />and general good housekeeping practices are encouraged by <br />supervision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.