Laserfiche WebLink
• <br />EXHIBIT D- RECLAMA'PION PLAN <br />(f ). Actual costs to reclaim the site based on what it <br />would cost the state using an independent contractor <br />to complete reclamation. <br />Backfilling $1.00 per cubic yard $7,000.00 <br />Grading $700.00 <br />Top Soil Application (top soil is already on property so <br />no additional application would be <br />needed). <br />Seeding <br />$10.00 per acre <br />$100.00 <br />Mulching <br />Fertilization <br />$20.00 per acre <br />$200.00 <br />( is not required according to the soil sample <br />a copy is enclosed for your convenience ) <br />Labor $2000.00 iNcludes equipment <br />Total cost for reclamation $10,000,00 <br />Determine and specify the point during the operation when the <br />site has reached a point of maximum disturbance. <br />Our expectancy could be five years. <br />