Laserfiche WebLink
<br />EXHIBIT D -----------RECLAMTION PLAN <br />We would like to make an amendment to our original reclamation <br />plan presently on file. <br />The amount of time to complete our reclamation plan would be <br />one year after the project is completed. <br />The procedure to complete this reclamation would be to not fill <br />the reservoir in as that is what we are building, so we would <br />nut be reclaiming the reservoir. We would use a bulldozer to <br />level around the top perimeter of the reservoir. we would use <br />a blade to cut the reservoir to a 3 to 1 slope. <br />At the end of the mining project when the reservoir is completed <br />it will have three trees which will be of the Aspen/Birch family <br />planted along the west side of the reservoir. Grass will be <br />planted along the west side as well. (See Reclamation Map for <br />details). <br />The grass seed will be Setter Homes and Gardens High Traffic <br />grass sped mixture. This grass seed is sun tolarant, drought <br />tolerant, disease tolerant, cold tolerant and very durable. <br />The contents are Sonata Perennial Rygrass, Shining Star <br />Perennial Rygrass, Boreal Red Fescue, Kenblue Kentucky Bluegrass. <br />There is no noxious weed seed in this grass mixture. <br />