Laserfiche WebLink
TITLE Paae No. <br />4.05.15 Water Rights and Replacement 4.05-16 <br />4.05.16 Discharge of Water into an Underground Mine 4.05-16 <br />4.05.17 Postmining and Rehabilitation of Sedimentation 4.05-16 <br />Ponds, Diversions, Impoundments, and Treatment <br />Facilities <br />4.05.18 Stream Buffer Zones 4.05-16 <br />RULE 4.06 TOPSOIL <br />4.06.1 General Requirements 4.06-1 <br />4.06.2 Removal 4.06-1 <br />4.06.3 Storage 4.06-1 <br />4.06.4 Redistribution 4.06-3 <br />4.06.5 Reconditioning 4.06-3 <br />RULE 4.07 SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS <br />4.07.1 General Requirements 4.07-1 <br />4.07.2 Temporary Sealing 4.07-1 <br />4.07.3 Permanent Sealing 4.07-1 <br />4.07.4 Abandonment in Designated Groundwater Basins 4.07-1 <br />RULE 4.08 USE OF EXPLOSIVES <br />4.08.1 General Requirements 4.08-1 <br />4.08.2 Pre-Blasting Survey 4.08-1 <br />4.08.3 Public Notice of Blasting Schedule 4.08-2 <br />4.08.4 Surface Blasting Requirements 4.08-2 <br />4.08.5 Records of Surface Blasting Activities 4.08-4 <br />4.08.6 Seismographic Measurements 4.08-4 <br />RULE 4.09 DISPOSAL OF EXCESS SPOIL AND UNDERGROUND <br />DEVELOPMENT WASTE 4.09-1 <br />RULE 4.10 COAL PROCESSING WASTE BANKS 4.10-1 <br />RULE 4.11 COAL PROCESSING WASTE <br />4.11.1 Burning 4.11-1 <br />4.11.2 Burned Waste Utilization 4.11-1 <br />4.11.3 Return to Underground Workings 4.11-1 <br />4.11.4 Disposal of Non-Coal Waste 4.11-1 <br />4.11.5 Dams and Embankments 4.11-1 <br />RULE 4.12 SLIDES AND OTHER DAMAGE 4.12-1 <br />RULE 4.13 CONTEMPORANEOUS RECLAMATION 4.13-1 <br />i <br /> lV <br />