Laserfiche WebLink
TITLE Paae No. <br />` 2.06.10 Coal Processing Plants and Support Facilities Not 2.06-15 <br />Located Within the Permit Area <br />2.06.11 In-Situ Processing Activity 2.06-15 <br />RULE 2 MISCELLANEOUS REQUIREMENTS 2-1 <br />RULE 3 PERFORMANCE BONDS 3.01-1 <br />RULE 4 PERFORMANCE STANDARDS <br />RULE 4.01 GENERAL PROVISIONS <br />4.01.1 Scope and Objective 4.01-1 <br />RULE 4.02 SIGNS AND MARKERS <br />4.02.1 Specifications 4.02-1 <br />4.02.2 Mine and Permit Identification Signs 4.02-1 <br />4.02.3 Perimeter Markers 4.02-1 <br />4.02.4 Duration of Maintenance 4.02-1 <br />4.02.5 Stream Buffer Zone Markers 4.02-1 <br />4.02.6 Blasting Signs 4.02-2 <br />4.02.7 Topsoil Markers 4.02-2 <br /> <br />RULE 4.03 ROADS <br />4.03.1 Haul Roads 4.03-1 <br />4.03.2 Access Roads 4.03-2 <br />4.03.3 Light Use Roads 4.03-3 <br />RULE 4.04 SUPPORT FACILITIES 4.04-1 <br />RULE 4.05 HYDROLOGIC BALANCE <br />4.05.1 General Requirements 4.05-1 <br />4.05.2 Water Quality Standards and Effluent Limitations 4.05-3 <br />4.05.3 Diversions and Conveyance of Overland Flow and 4.05-3 <br /> Shallow Groundwater Flow and Ephemeral Stream <br /> Draining a Watershed Less Than One Square Mile <br />4.05.4 Stream Channel Diversions 4.05-4 <br />4.05.5 Sediment Control Measures 4.05-5 <br />4.05.6 Sedimentation Ponds 4.05-6 <br />4.05.7 Discharge Structures 4.05-7 <br />4.05.8 Acid-forming and Toxic-forming Spoil 4.05-8 <br />4.05.9 Permanent and Temporary Impoundments 4.05-8 <br />4.05-10 Underground Mine Entry and Access Discharges 4.05-9 <br />4.05-11 Groundwater Protection 4.05-9 <br />4.05.12 Protection of Groundwater Recharge Capacity 4.05-9 <br />4.05.13 Surface and Groundwater Monitoring 4.05-10 <br />4.05.14 Transfer of Wells 4.05-16 <br /> <br /> <br />iii <br />