Laserfiche WebLink
Revised Jan. 16, 1985 <br />4.2 Bonding <br />Reclamation costs were calculated in accordance with Section 4.8 of the <br />Mt. Gunnison M and R Plan. <br />Reclamation Cost Estimate <br />Activity- <br />Demolitian of fan and appurtenant structures E 2,000 <br />Removal of power lines and poles S 3,000 <br />Removal of gravelled pad E 200 <br />Ripping of 0.6 acre pad and 620' of road (0.14 acres) <br />@ 398/acre x 0.15 acres 3 74 <br />Top soiling 0.75 acres (2 hrs. @ 385/hr. using a <br />• DB bulldozer to redistribute topsoil) E 190 <br />Seedbed preparation and fertilization <br />@ 3180/acre x 0.15 acres S 135 <br />Drill seeding @ 3600/acre x 0.75 acres E 450 <br />Mulching @ 5500/acre x 0.75 acres S 300 <br />Fan Pad topsoil haulage from mine's permanent <br />topsoil st~ckpile, if necessary 3 <br />@ 52.18/yd for 4000' haulage x 1452 yd E 3.165 <br />SUBTOTAL E 9,514 <br />lOX Contingency 951 <br />TOTAL ESTIMATED RECLAMATION COSTS <br />FOR BONDING PURPOSES* 310,465 <br />• The current bond for Mt. Gunnison is 31,952,690. Current estimates for <br />reclamation costs total 51,923,881. Thus the existing band is sufficient <br />to cover the reclamation costs for this activity. <br />