Laserfiche WebLink
Rule 2: Permits <br />' Reclamation of Ephemeral Drainages <br />Disturbed portions of each drainage channel will be filled as appropriate, and regraded to <br />conform to the approximate original contour, as shown on the Post Mining Topography <br />map (Map 2.05.4-1) and the longitudinal profiles in Figure 2.05.4-18a. Channels will be <br />lined with riprap or other protection as necessary to stabilize the channel and prevent any <br />erosion that would violate the water quality standazds for the receiving stream, and to <br />comply with Rule 4.27.3(7). The design specifications to reclaim ephemeral drainage <br />channels that will be impacted by mining activities are summarized in Table 2.05.4-1a. <br />.• <br /> <br />Table 2.05.4-1 a <br />Design Specifications for Reclaimed Ephemeral Drainages <br /> Design Top Channel <br />Reclaimed Dischazge Slope Depth Width lining/D50 <br />Channel Location (cfs % feet) (feet size inches <br />AI above Pond 8-l, 7.54 19.2 0.2 10.8 Riprap/1.50 <br /> U er Drainage <br />A2 above Pond 8-l, 21 28 12.5 0.4 11.9 Riprap/3.00 <br /> Lower Draina e <br />B above Pond 7-2 ] 0.29 I6.0 0.2 11. I Ri ra /3.00 <br />C above Pond 7-1 18.87 11.3 0.4 11.8 Ri ra /3.00 <br />D above Pond 6-1 17.53 16.6 0.3 11.8 Ri ra /3.00 <br />E PS 6.57 26.0 0.4 13.0 Grass <br /> Mixture <br />F P4 54.63 11.4 0.7 13.6 Ri ra /6.00 <br />G P2 11.30 11.4 0.2 11.3 Ri ra /3.00 <br />~~~~ <br />2.05-62b (revised 10/4/01) <br />