Laserfiche WebLink
{~ <br />~ • ~• <br />4. The plant site will take advantage of the existing road and storage <br />area so minimum site preparation will be needed. The road will be <br />upgraded to the extent necessary to serve the plant. <br />5. Excavated material will be contoured in with the natural slope to <br />present a natural appearance. All cut slopes will be no steeper <br />than 1 1/2 to 1, and fill slopes will be no steeper than 3 to 1. <br />6. The outfall from the discharge line info IJindy Gulch will be designed <br />so that excess energy from the water will be dissipated adequately to <br />prevent scouring. This will be accomplished with a small rock-lined <br />pool or a pile of rocks. <br />7. Revegetation of disturbed areas will be done by seeding and <br />fertilization with the following: (Based on REHABILITATION ASSESS- <br />. PIENT AND 'ZONAL REVEGETATIO;d GUIDli - Rio Crande National Forest, <br />prepared by Terry Brock, Soil Scientist.) <br />S ecies Variety Pounds/Acre <br />~• <br />Crested [•]heatgrass Fairway 8 <br />Timothy - 4 <br />Hard Fescue - 4 <br />Mnnnta111 Brome Bromar S <br />24 <br />The seed will be applied in a mixture, along caith 20-10-0 <br />fertilizer at a rate of 100 pounds per acre. <br />\. <br />S. The plant site will be cleaned up completely upon completion of <br />construction. <br />9. Approved mufflers or other devices will be required on all internal <br />combustion engines used on the project. <br />10. .All surface facilities will be painted a flat, non-reflective <br />green color. <br />11. Bonding or a cash deposit in the amount of ;450.00 will be provided <br />by the operator as a prerequisite to approval of the Operating Plan <br />for the purpose of restoring the resources to an acceptable and usable <br />condition, if provisions for reclamation of the land as proposed and <br />agreed to in the Operating Plan, are not fulfilled. (APPENDIX V.) <br />_ - 146 -. <br />i <br />j <br />i <br />I <br />r <br />