My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29503
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:26 PM
Creation date
11/20/2007 11:02:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Hydrology
Doc Date
1/21/1999
Doc Name
CERTIFICATION COLO WASTEWATER DISCHARGE PERMIT SYSTEM PN COG-600000 FACILITY COG-600177
From
OXBOW MINING INC
To
DMG
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 21 <br />Permit No. COG-600000 <br />C. MONITORING REQUIREMENTS <br />1. Freauencv and Sample Tvce <br />h. cont. <br />(2) Used Pipes, tanks, or other similar vessels: <br />Effluent Parameter Measuremrnt Freauencv Sample Tvne <br />Flow, gpm Twice per Discharge L~stantaneous <br />Total Suspended Solids, mg/P Twice per Discharge Grab <br />Chemical Oxygen Demand, mg/l Twice per Dischazge Grab <br />Total Recoverable Iron, mg/P Twice per Discharge Grab <br />BTEX, mg/P Twice per Discharge Grab <br />Bemm~e, mg/P Twice per Discharge Grab <br />Total Residual Chlorine, mg/P Sce I.B.2.c.(4) Twice per Discharge Grab <br />pH, s.u. Twice per Discharge Grab <br />Oil and Grease, mg/P Twice per Discharge Visual Sce I.D.13. <br />Total Phosphorus as P, mg/P See I.C.2. Monthly Grab <br />Twice per discharge sampling shall be conducted a[ the beginning and end of the testing period. <br />i. Facilities discharging super chlorinated water (50-500 mg/P) from potable waur lines for the <br />disinfection of these lines in a routine or planed situation shall monitor all effiuem <br />pazameters listed at the following frequencies using the listed sample type unless different <br />frequencies are listed on the facility certification. <br />Effluent Parameter Measttrtunrnt Frequency Sample Tvoe <br />Flow, gpm Twice per Discharge Instantaneous <br />Total Residual Chlorine, mg/P Sce I.B.2.c.(4) Twice per Dischazge Grab <br />7~vice per dischazge sampling shall be conducted at the beginning and end of the testing period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.