Laserfiche WebLink
ENVIRONMENT, INC. <br />MARCH 2B, 2001 <br />PAGE 2 <br />types on the site. This is a county issue that will be address <br />with the County Health Department. <br />For Small Commercial Buildings. - Again PS&G would have to engineer the <br />building foundations to the soils where they would be built. This <br />will be addressed with County Building Department and Engineering <br />staff. <br />Prime Farm Land - We concur, this was the same assessment Mr. Norm <br />Wells had in the NRCS letter. <br />Soil Erosion Potential - <br />1. Mr. Gary Cole, the ranch manager for Tom Sharkey, has <br />been working with Ron Broda since Mr. Sharkey purchased <br />the property in early 2000. Mr. Cole and Mr. Broda have <br />worked closely together to prepare a plan and control the <br />problem weeds on the property. Weed control was sadly <br />neglected on the ranch in the years proceeding Mr. <br />Sharkey's purchase. Attached is a copy of the weed <br />control plan for your file. For your information during <br />summer and fall of 2000 the ranch was used as a test site <br />for controlling various noxious weed in cooperation with <br />the Weld County Weed Management Specialist. Mr. Sharkey <br />is committed to controlling the undesirable weeds on the <br />ranch and mining area as it develops. <br />2. PS&G will not change the sloping plan at this time. <br />3. This appears to have been a typo on our part. The <br />correct nomenclature should be as they suggested Phospho- <br />rus (PZ05). This should be corrected on page 14 of the <br />application. <br />4. Thank you for the suggestion, as we noted on page 14 in <br />the application PS&G would do soil tests and apply <br />fertilizer as needed. When the soils test is done, PS&G <br />will request the lab test for salt and adjust the seed <br />mixture accordingly. The Division will be supplied with <br />the information and a change to the seedmix will be done <br />as required. <br />5. So noted, seeding times are now November 1 to April 30 as <br />suggested. Attached is a revised SEEDING TIME statement <br />for page 14 of the application. <br />6. No mulch will be used in the reclamation plan. PS&G is <br />aware that they have to make the grass grow and that <br />mulch may help. I have had some negative results with <br />mulch and prefer to react to site specific conditions <br />when planting is done. Inter-seeding with a cover crop <br />