My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69701
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:18:47 PM
Creation date
11/20/2007 10:59:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002014
IBM Index Class Name
Permit File
Doc Date
4/19/2002
Doc Name
Response to 02/14/02 letter
From
Summit Enginering Co.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b.) In addition we have highlighted the adjacent surface owners within 200 feet of the <br />affected area. <br />c.) We have labeled and highlighted the proposed access road, pit boundary, and <br />topsoil stockpile. There will be NO overburden stockpiles or waste rock fills and there <br />will be no permanent buildings or processing plant. <br />Exhibit E <br />(2) Mining Plan Mao <br />d. We have labeled and highlighted the direction that mineral extraction will proceed. <br />e. A narrative description has been provided. <br />f. The affected area surrounding it has not been previously mined or disturbed. <br />Exhibit E <br />(3) Reclamation Plan Map <br />a. The gradient of the reclaimed slopes is shown on the Reclamation Plan Map and <br />has been highlighted for ease for identification. <br />b. Vegetation will be re-establisehed over the entire affected area in phases and <br />according to the NRCS conservation p{an submitted herewith. <br />c. No ponds, other than a stormwater detention pond to be located or shown on the <br />reclamation plan map will be constructed. <br />d. There is no overburden in the affected area. <br />e. As stated in the NCRS Conservation Plan, this area may not have enough top soil <br />to re-apply to a thickness of 10"-12". !f this condition occurs, the NCRS plans <br />recommends hauling topsoil to the site sufficient to cover ail phases to a depth of 10- <br />12" <br />Exhibit G -Source of Legal Right to Enter (Rule 6.3.7) <br />We have enclosed a copy of a Real Property Lease between the owners, <br />Randall L. Robins and Lou Ann Robins as lessor for the benefit of Robins <br />Construction Company LLLP as lessee. <br />Please let us know if you need any further information <br />Sincerely, <br />~~~ ~~ <br />Scott Johnso , PE <br />Summit En ineering Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.