Laserfiche WebLink
<br />E?~HIBIT D <br />Nining Plan Narrative: <br />r~ <br />L~ <br />As with most stream bed operations there is <br />no topsoil involved. Instead a front end loader <br />will excavate the gravel material directly from <br />the stream bed and load into county dump trucks. <br />It will then be hauled to the maintenance site. <br />The gravel will not be graded. <br />The machinery used in the operation will be <br />the front end loader, dump trucks and possibly a <br />dozer to smooth the stream bed at time of reclamation. <br />There will be no water diversion or impoundment <br />resulting from this operation. This is a normally <br />dry creek and this operation will not affect the <br />down stream water flow following heavy rains in any <br />significant way. <br />Although the pit acreage requested is 46 acres, <br />it is unlikely that more than five acres of the <br />stream bed will be disturbed at any one time. It is <br />probablg that stream will flood several times before <br />the estimated life of the pit is reached. <br />