Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 011 <br />Date : 11/082006 <br />User : JRS <br />State :Colorado <br />County :Las Animas <br />Site :New EIk Mine <br />Permitlob # :C-1981-012 <br />Abbreviation :none <br />Filename : C012-011 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Partial Phase I Bond Release SL-02 -Releasable Amounts <br />Task description :Rip Cover Materfal of RDA for DWP <br />HOURLY EQUIPMENT COST <br />Alternate methods - <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br />Seismic : 12,756 BCY Load factor : NA Bank volume : 12,758 BCY <br />Area : NA acres Rip depth (ft) : NA Volume : NA BCY or CCY <br /> <br />Source of estimated quantity :Map 15; Division Estimate <br />Source of estimated load factor :NA <br /> <br /> <br />HOURLY PRODUCTION ;: <br />,. <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : 3,000 feeUsecond Unadjusted production <br />Unadjusted production : 1,820.80 cu. yds./hour per selected method : 1,820.80 cu. yds./hour <br /> <br />Area : Avg. ripping depth : NA feeVpass Site altitude : 7,500 feet <br />Average ripping width : NA feeVpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : NA feeVpass Job efficiency factor : 0.83 (1 shiWday) <br />Average dozer speed : NA feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : NA minutes pass <br />Production per unit area : NA acres/hour Adjusted unit production : 1,511.26 cu. yds./hour <br />Unadjusted production : NA cu. yds./hour Adjusted fleet production : 4,533.79 cu. yds./hour <br />JOB TIME AND COST <br />• Fleet size : 3 dozers) <br />Unit cost : $0.125 per cu. yd. <br />~c Z8 >~ -3 <br />Total job time <br />Total job cost <br />7 0~ ~7 <br />