My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-11-16_PERMIT FILE - C1981012A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2006-11-16_PERMIT FILE - C1981012A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 10:05:15 AM
Creation date
11/20/2007 10:56:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
11/16/2006
Doc Name
Partial Phase I Bond Release
Section_Exhibit Name
Exhibit 28 Appendix A Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PROJECT IDENTIFICATION <br />Task # : 010 <br />Date <br />User <br />HOURLY EQUIPMENT COST <br />08-Nov-2008 <br />JRS <br />PermiUjob # :C-1981-012 <br />Abbreviation :none <br />Filename : C012-010 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Partial Phase I Bond Release SL-02 -Releasable Amounts <br />Task descnpbon :Compact Coal Stock ile Foot riots at Development Waste Pile <br />,. „ ... P P <br />Machine description :CAT 815E Horsepower: 220 <br />Compactor type :Reclamation Shift basis : 1 per day <br /> <br />Cost Breakdown <br />State :Colorado <br />Couniy :Las Animas <br />Site :New Elk Mine <br /> Utilization % Data source : (CRG) <br />Ownership cosUhour : $44.45 NA <br />Operating cosUhour : $43.38 100 <br />Operator cosUhour : $31.76 Nq <br />Total unit cost/hour : $119.59 Total fleet cosUhour : $119.59 <br />MATERIAL QUANTITIES <br />Loose <br />volume : 28,218 LCY <br />Shrinkage Compacted <br />factor : 0.870 volume : 22,808 CCY <br />Source of estimated volume : Tota! of Tasks 005-009 <br />Source of estimated shrinkage factor :CAT Handbook <br />HOURLY PRODUCTION <br />Unadiusted hourly oroducion - (W x S x L x Cl / P <br />Compacted width per pass (W) <br />Average compactor speed (S) <br />Compacted thickness of each lift {L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted hourly unit protluction <br />Job Condition Correction FaMors <br />Site altitude : 7,500 feet <br />Altitutle adjustment factor <br />Job efficiency factor <br />Net job correction <br />Adjustetl hourly unit production <br />Adjusted hourly fleet production <br />...................... <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />CIRCES Cost Estimating Software <br />Source <br />1.00 (Cat HB) <br />0.83 (1 shiff/day) <br />0.83 multiplier <br />694.85 <br />894.85 <br />1 compactor(s) Total job time : $2,82 <br />$0.172 per CCY Total job cost : $3,92f <br />6.42 feet <br />4.00 mph <br />8.00 inches <br />16.3 (5,280 ft./12 in./27 cu.ft.) <br />4 passes <br />837.17 CCY/hr <br />CCY/hr <br />CCY/hr <br />hours <br />Ex z8 ~ nn ~7 <br />/~" 3 ~ o d" l / '~t1 t3~ (~ S~o2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.