My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69535
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69535
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:59 PM
Creation date
11/20/2007 10:55:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
PR2 ADEQUACY RESPONSE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFY THAT THE AS-BUILT CHAh;NEL MEETS THE MINIhiUM REQUIREMENTS OF THE <br />APPROVED DESIGN INCLUDING DIMEf1SI0NS, GRADES, RIPRAP AND BED THICKNESS AND <br />SORTING. <br />RESPONSE: <br />As discussed, CYCC has had new maps made for the Eckman Park area. <br />This was done after it was found that the mapping, which was used in <br />the permit revision, contained some discrepancies. The new maps <br />demonstrate that the drainage gradients have been reduced. The <br />Postmining Topography Map (Permit Revision 86-2-2 (Map 48A)), was <br />redrawn using this latest mapping. <br />Profiles drawn for drainage 9/10-2 (51E) show that there is little <br />difference, if any, between the premining gradient and the proposed <br />gradient. Also, as per Map 86-2-2 (Map 48A) the drainage, where it <br />intercepts the active pit, will be routed to the west. This will <br />• decrease the amount of flow through this drainage. CYCC, as proposed <br />in the permit revision, will riprap this drainage to further stabilize <br />this drainage. Drainage 9/10-3 does not appear on the new mapping. <br />In reference to drainages 31-1 and 31-2, Table 3-2 of Appendix II, <br />shows that riprap would be required if the drainage is reconstructed <br />per the approved plan. Therefore, it is recommended that the proposed <br />work for. these drainages be approved. The proposed riprap should <br />provide for a stable drainage and complement the proposed postmining <br />land use. <br />In reference to the remainder of the drainages, the new map indicates a <br />reduction in the drainage gradient. The slopes for these are as <br />follows: <br />Existing Topographic hlap <br />Location 1985 I4apping <br />. 7-1 330 <br />51 25°~ <br />New Topographic Map <br />1986 Mapping <br />23.8,E <br />13.9`,b <br />
The URL can be used to link to this page
Your browser does not support the video tag.