Laserfiche WebLink
Operating hours of the pit a~controlled the Montrose County SpeciaTUse Permit. <br />Overhead power lines as illustrated on the Exhibit C-1 Pre-Mining Map, cross the Phase I and <br />Phase III areas. San Miguel Power Association maintains an easement for these structures. The <br />gavel operation will not affect the stability of these structures. <br />The only commodities to be mined are construction materials. Construction materials include but <br />aze not limited to pit run gavel, road base, and screened sized gavel. No secondary conunodities <br />aze to be mined or extracted. <br />The construction products will be used for the production of asphalt, concrete and road <br />construction. The gavel products are also used as select and special fill for construction sites. <br />D-3 <br />