My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69466
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69466
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:56 PM
Creation date
11/20/2007 10:53:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000049
IBM Index Class Name
Permit File
Doc Date
6/28/2000
Doc Name
ANGIE PIT FN M-2000-049 112C PERMIT APPLICATION ADEQUACY REVIEW RESPONSE 2
From
J E STOVER & ASSOCIATES
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seeding will occurring late fall or early spring (from abou~ctober 31 to April 1) in <br />order to take advantage of available soil moisture conditions during the spring. The <br />applicant holds sufficient water rights within the Gurley Ditch to provide irrigation to all <br />areas and phases of the gravel operation to enhance the revegetation effort if necessary. ~ <br />80/20 Nitrogen/Phosphate fertilizer will be applied at the time of seeding at the rate of 200 <br />ponds per acre and worked into the soil during the seed bed preparation. <br />The pit excavation will leave nearly vertical faces of approximately 32' in height, if the pit is <br />mined to planned depth, during advance. These slopes will be reduced to 4h:1 v before the <br />application of topsoil or cover material. This slope reduction will be accomplished by placing <br />refuse material along the nearly vertical face of the side walls of the pit, providing acceptable <br />slopes that will follow the advancing face at not more than 300 feet. If insufficient refuse material <br />is available, the operator will also excavate the side slopes to a 4h:1 v slope on advance. The <br />advancing face will be excavated to a 4h:ly slope as it nears the disturbance line. The operator <br />will take care not to encroach on the disturbance line during slope reduction. In Phase I, a berm <br />will be developed along the southern and western exposure of the pit during mining, this berm <br />will remain in place and will be covered with topsoil or cover material at final reclamation. <br />Phase I will expose a maximum advancing face of 1200 feet, Phase II will expose a maximum <br />advancing face of 1495 feet and Phase III will expose a maximum advancing face of 595 fee[. <br />Phase II will a expose a pit floor area of 25.3 acres, Phase II will expose a pit floor area of 32.0 <br />acres and Phase III will expose a pit floor area of 2.0 acres. <br />Phase III will expose an area for facilities and processing of 3.2 acres, Phase II will expose an area <br />for facilities and processing of 3.8 acres and Phase III will expose an area for facilities and <br />processing of 3.8 acres. <br />Any compacted side slopes and floor of the pits will be ripped before final reclamation. If the <br />underlying sandstone floor is exposed, a minimum of 2 feet of cover material will be applied <br />before final reclamation, if [he sandstone floor is not exposed, due to the presence of ground <br />water, the 2 feet of gravel material lefr in place above the ground water will remain in place as <br />cover material. The final slope of each pit will be loosened by the front-end loader and then <br />reshaped before final reclamation. <br />The access road and ditch crossings to Phase I and Phase III serve as entry onto the private land of <br />the gravel pit Owner/Operator and will remain upon completion of the operation. <br />Other reclamation tasks will include the removal of the semi portable [ruck scales and the removal <br />of the portable screening/crushing plant, [he portable storage shed, the portable diesel/electric <br />generator set, the portable fuel tank and the portable sanitation facility. <br />The operator is aware that grazing may not occur on the acreage in reclamation without prior <br />authorization from the Division, in consultation with the local Soil Conservation District. <br />These recorded rights can be found in Exhibit N -Legal Right to Enter and they aze <br />restated in Exhibit G -Water Information. <br />E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.