My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69459
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:56 PM
Creation date
11/20/2007 10:53:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 2 OTHER PERMITS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 4 <br />• Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations (continued) <br />a) Active Mining Outfall(s) (continued) <br />ALTERNATE LIMITATIONS <br />Any discharge or increase in the volume of a discharge caused by <br />precipitation within any 24-hour period less than or equal to the <br />10-year. 24-hour orecioitation event (or snowmelt of equivalent <br />volume) maX comply with the following limitations subject to <br />burden of proof requirements described in Part I.B.l.d). <br />Effluent Parameter Discharee Limitations <br />Maximum Concentration <br />Daily Maximum J <br />Flow, MGD Report <br />pH, standard units (minimum-maximum) 6.5-9.0 <br />Oil and Grease, mg/1 (No visible sheen) 10 e/ <br />Settleable Solids, ml/1 E/ 0.5 <br />Total Dissolved Solids, mg/1 Report <br />(Colorado River Basin Only) <br />• Total Phosphorus (as P), mg/1 Report <br />(Dillon Reservoir and Upper Bear Creek Drainages Orly) <br />Any discharge or increase in the volume of a discharge caused by <br />precipitation within any 24-hour period greater than the 10-year. <br />24-hour orecipitation event (or snowmelt of equivalent volume) <br />may comply with the following limitations subject to burden of <br />proof requirements describd in Part I.B.l.d). <br />Flow, MGD - monitoring only per Part I.B.2.a) <br />pM shall remain between 6.5 and 9.0 s.u. <br />Oil and grease shall not exceed 10 mg/1. J e/ <br />ToCa1 Dissolved Solids, mg/1 - monitoring only per Part I.B.2.a) <br />(Colorado River Basin Only) <br />Total Phosphorus (as P), mg/1 - monitoring only per Part I.B.2.a) <br />(Dillon Reservoir and Upper Bear Creek Drainages Only) <br />b) Posr.-Mining Outfall(s) <br />Post-mining limitations may apply to outfalls servigg surface <br />areas which have been returned to the required contour and on <br />which revegetation (specifically, seeding or planting) work has <br />commenced. .The permittee may request consideration for change <br />from active mining limitations to post-mining limitations when <br />these conditions have been met. Each facility certification <br />shall state whether active mining or post-mining limitations <br />apply to each authorized outfall. <br />See Part I.B.4, for Footnotes <br />
The URL can be used to link to this page
Your browser does not support the video tag.