Laserfiche WebLink
PART I <br />Page 5 <br />Permit No. COC-850000 <br />B. EFFLUEt'T LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Ffl:luent Limitations (continued) <br />b) Post-Mining Outfall(s) (continued) <br />Ef 1•ient Parameter <br />Discharge L m'tat.ion <br />Maximum Concentration <br />Da Maximum <br />Flow, MGD Report <br />pH, standx.rd units (minimum-maximum) 6.5-9.0 <br />011 and Crease, mg/1 (No visible sheen) 10 J <br />Settleable: Solids, ml/1 g/ 0.5 <br />Total Dissolved Solids, mg/1 (Colorado River Basin Only) Report <br />Total Phosphorus (as P), mg/1 Report <br />(Dillon Reservoir and Upper Bear Creek Drainages Only) <br />ALTERNATE LIMITATIONS <br />Any discharge or increase in the volume of a discharge caused by <br />precipitation within any 24-hour period greater than ttto 10-year. <br />24-hour precipitation event (oz snowmelt of equivalent volume) <br />may comply with the following limitations sub]ect to b~irden of <br />proof requirements described in Part I.B. 1. d). <br />Flow, MGD - monitoring only per Part I.B.2.b) <br />pH shall remain between 6.5 and 9.0 s. u. J . <br />Oil and grease shall not exceed 10 mg/1. J g/ <br />Total Dissolved Solids, mg/1 - monitoring only per Part I.B.2.b) <br />(Colorado River Basin Only) <br />Total Phosphorus (as P), mg/1 - monitoring only per Part I.B.2.b) <br />(Dillon Reservoir and Upper Bear Creek Drainages Onl}~) <br />c) General Limitations - Active and Post-Mining Outfalls <br />1. There shall be no discharge of sanftary waste waters from <br />toilets or related facilities. <br />2. There shall be no discharge of floating solids or 'visible foam <br />in other than trace amounts. <br />3. No chemicals are to be added to the discharge unless <br />permission for the use of a specific chemical is granted by <br />the Division. <br />4. There shall be no land application of wastewater, other than <br />for dust cbntrol. <br /> <br /> <br />See Part I.B.4. for Footnotes <br />