Laserfiche WebLink
EXHIBIT "E" <br />RECLAMATION PLAN <br />COLORADO DIVISION OF HIGHWAYS <br />I DOTSERO CINDER PIT <br />"A" After the cinders are removed from the bottom and sides of the <br />ravine, the backslopes will be contoured to blend with the sur- <br />rounding terrain. <br />"B" The slopes will be variable and some will be quite steep. <br />"C" The floor of the pit will be smoothed and graded to drain with <br />the natural drainage leaving no standing water. <br />"D" Material too large to use or any waste material will be smoothed <br />to blend with the pit door or the pit slopes. <br />"E" Areas of the pit in which work has been completed will be reclaimed. <br />"F" When work in the pit is completed, the haul road that mill nnt. ho <br />required for access, and stockpile areas will be reclaimed. <br />"G" The pit slopes will be left rough and will be seeded as recommended <br />by the Colorado Division of Highways. See next page. <br />•-~:.': <br />