Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDMG <br />Task # : 014 State :Colorado <br />Date : 08/082005 County : La Plata <br />User : TAK Sde : Carhon Junction Mine <br />PermNOb # : C-92-080 <br />Abbreviation :none <br />Filename : CO60-014 <br />Pertnft or other job action : TR-13 <br />Task description :Haul topsoil from topsoil stockpile 2 to North pit haul road <br />_. <br />HOURLY EQUIPMENT COST <br />Model : Cet 657E w/push-pull Shift basis : f per day <br />Cost Breakdown <br />Ownership cost/hour <br />Operating cosf/bour <br />Operetor cosUhour <br />Total unit cosVhour <br />Initial <br />voume: 3,000 BCY <br />Horsepower : 1045 <br />Weight (UST) : 80.07 <br />Coat data source : (CRG) <br />$659.84 <br />Loose <br />volume: 4,288 LCY <br />Source of quantity take-off : Cost estimate in TR-12 <br />Source of estimated swell factor :OMG estimate <br />Hauling Caoaciri <br />Scraper Payload (weight) Basis <br />Material weight : 1,600 <br />Material description <br />Top Soil <br />Rated payload : 104,000 pounds <br />Payload capacity : 65.00 LCY <br />Cycle Time (load + haul + spread + return) <br />Travel time <br />NA <br />Total fleet cosVhour <br />d (volume) Basis <br />Struck volume : 32.00 LCY <br />Heaped volume : 44.00 LCY <br />Average volume : 38.00 LCY <br />Adjusted capacity : 38.00 LCY'° <br />Loading time : 1.10 minutes " <br />Maneuver and spreading time : 0.80 minutes <br />waaro eme Par Pea a. Pvsn~PPn rbaa: <br />Route Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul : 1,100 2.7 5.0 7.7 1,426 0.87 minutes " <br />Return : 1,100 -2, 7 5.0 2.3 3 023 0.36 minutes " <br />--trevo! time aajuat°e laraoxlererian atW Aepbretion ffi V°ad arM aLmP PPlrlb <br />velocities are mat. attainable per total resistance slbwn, rid oversee <br />Job Condition Correction Factors <br />Site altitude (feet) : 7,000 <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifl/day) <br />Net job correction factor : 0.83 <br />Total cycle time : 2.94 minutes <br />A justed Hourly Production <br />Unadjusted unit production : 1,553.03 LCYIHOUr'"' <br />Adjusted unit production : 1,289.02 LCY/Hour <br />Adjusted fleet production : 1,289.02 LCYIHOUr <br />times werPre on p,err-pvn moaon <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) Total job time : 3.32 Hours <br />Unit cost : 50.512 /LCY Total job wst : $2,193 <br />Job utilization <br />$94.42 NA <br />$203.24 100 <br />