Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />Task # : 013 <br />Date : 01/052006 <br />User: TAK <br />State :Colorado <br />Permitlob # : C-92-080 <br />Agency or organization name : CDMG <br />County : La Plata <br />Site :Carbon Junction <br />Permit or other job action : TR-13 <br />Task description :Grade North Pi! haul road fill <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H Horsepower : 215 <br />Attachmentno.l:NA <br />Attachmentno.2:NA <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cost/hour : $34.94 NA <br />Grader operating cosUhour : $42.36 100 <br />Ripper operating cosUhour : $0.00 NA <br />Operator cosUhour : $31.97 NA <br />Total unit cosUhour : $109.27 Total fleet cost/hour : $109.27 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 9.24 acres <br />Source of estimated acreage :2.31 acres (p. 5-2 recl. plan) X 4 passes <br />.;: .. <br />HOURLY PRODUCTION <br />Width of blade ovedap per pass : 2.00 feet <br />Nel grading or ripping width per pass : 10.10 feet " "width of upper beam on upping applications <br />Unadjusted hourly unit production : 1.5303 acres hour <br />Job Condition Correction Factors Source <br />Average site altitude : 7,000 feet Altitude adjustment factor : 1.00 ~ (Cat HB) <br />Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br />Net job correction : 0.8500 multiplier <br />Adjusted houdy unit production : 1.3008 acres/hour <br />Adjusted hourly Fleet production : 1.3008 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 7.10 hours <br />Abbreviation :none <br />Filename : C080.013 <br />Unit cost : $84.01 per acre Total job cost : $776 <br />