Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADERTEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : COMG <br />Task # : 012 State :Colorado Penn~ob # : C-92-080 <br />Date : 12/052005 County : La Plata Abbreviation :none <br />User: <br />Site :Carbon Junction <br />Filename : C080-0f2 <br />Permit or other job action : TR-13 <br />Task desuiption :Haul boxcut spoil fill // PRSA to N. Pit Haul Road <br />HOURLY EQUIPMENT COST ~~ Shift basis : ~ 1 per day <br />Truck/loader team <br />Support equipment -Load area <br />Road maintenance -Motor grader <br />-Water truck :Water Tanker, 2, 500 Gel. <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Toot Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA misctruk <br />°~ Utilization-machine : 95 100 NA NA NA 20 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosuhour: $19.68 528.61 NA NA NA $6.78 <br />Operating wst/hour: $26.05 $44.32 NA NA NA $3.23 <br />Ripper op. cosuhour: NA NA NA NA NA NA <br />Operator cosUhour : $21.75 $31.97 NA NA NA $21.16 <br />Unit subtotals : $67.48 $104.90 NA NA NA $31.17 <br />Number of units : 3 1 0 0 0 1 <br />Group subtotals : Work : $307.34 Support : $0.00 Maintenance : $31.17 <br />Total work team costRrour : $338.51 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,500 BCY favor : 1.430 volume : 5,005 LCY <br />Source of quantity take-off :Permit page 5-30 <br />Source of estimated swell factor : CDMG estimate <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck CaoaclN <br />Truck Payload (weight) Basis ; ~ Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Decomposed rock - 50% Rock, 50% Eadh Heaped volume : 18.00 LCY <br />Rated payload : 50,300 pounds Average volume : 15,00 LCY <br />Payload capacity : 17.34 LCY Adjusted volume': 17.34 LCY <br /> Final truck volume based on number of loader passes : 14.18 LCY <br /> Wck volume atljualad to nW exce etl rateC payloeE or heapeG wlume <br />Loading Tool Caoaciri : Job Condltlon Corrections : Site altitude (ft.) : 7,000 <br />Rated capacity (nom. heaped) : 7.000 LCY Truck Loader Soura <br />Descr.: Blasted rock - goody blasted (60 - 75%) Attitude adj.: 1.000 1.000 (Cat H! <br />Bucket fill factor : 0.675 Job eificiency : 0.830 0.830 (T shilT/dt <br />Adjusted bucket capacity : 4.725 LCY Net correction : 0.830 0.830 <br />