Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 010 <br />Date : 03.Ian-2006 <br />User : TAK <br />Agency or organization name : CDMG <br />Permit/job # : G92-080 <br />Abbreviation :none <br />Filename : C080-010 <br />Horsepower: 220 <br />Compactor type :Pad Foot <br />Shift basis : 1 per day <br />Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : $47.73 NA <br />Operating cosUhour : $46.78 100 <br />Operator cosUhour: $31.78 NA <br />Total unit cosf/hour : $126.29 Total fleet cost/hour : $128.29 <br />MATERIAL QUANTITIES <br />Loose Shrinkage Compacted <br />volume : 46,250 LCY factor : 0.750 volume : 34,688 CCY <br />Source of estimated volume : TR-12 estimate <br />Source of estimated shrinkage factor :OMG estimate <br />HOURLY PRODUCTION <br />Unadiusted hourly orodudion = (W x S x L x C) / P <br />Compacted width per pass (VV) : 6.42 feet <br />Average compactor speed (S) : 2.50 mph <br />Compacted thickness of each lift (L) : 12.00 inches <br />Conversion constant (C) : 16.3 (5,280 ft./12 in.Y17 cu.ft.} <br />Required number of machine passes (P) : 5 passes <br />Unadjusted houdy unit production : 627.88 CCY/hr <br />Job Condition Correction Factors Source <br />Site altitude : 7,000 feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiff/day) <br />Net job correction : 0.83 multiplier <br />State :Colorado <br />County :La Plata <br />Site :Carbon Junction <br />