Laserfiche WebLink
Page 1 of 2 <br />File name: cost summary3.xls <br />Date: 124/2006 <br />~, ~ Colorado Division of Minerals and Geology <br />'~ ;~~ Reclamation Cost Summary <br />Permlt NO. C-92-080 pmpamd by: TIC <br />Mina name: Carbon Junction Mine permit orlob action: TRTR=13 county: La Plata <br />TASK LIS7IDIRECT COSTSI <br />Task no. Task description Form Used Fleet Task Direct Cost <br />Size Hours <br />North pit <br />001 Bring down-cast spoil from slope of N. Pit up to bench at N. Pit excavate 1 19.78 $ 2,243 <br />002 Cut spoil at base of North Pit scarp, then push to pit tlozer 1 64.19 $ 11,433 <br />003 Move boulders/cobbles on N.Pit bench to insitle edge of bench dozer 1 26.00 $ 4,631 <br />004 Haul fill from PRSA to North Pit WUJloader 1 88.51 $ 41,965 <br />OD5 Regratle North Pit fill [o final contour tlozer 1 121.13 $ 21,576 <br />006 HaulBSpread topsoil fill 8 growth medium fl t.s, pile i2 [o N. Pit suape2 1 215.29 $ 57,643 <br />007 Final-grade topsoil on North Pit tlozer i 348.99 $ 62,164 <br />008 Revegelate North Pit revege 1 16.70 $ 6,844 <br />OD9 Consbuct 3 pontls TR-12 est. 1 18.00 $ 7,500 <br />010 Compact N. Pit fill (most fill is topsoil with some blasted rock) compact 1 66.56 $ 8,406 <br />North pit haul road. topsoil stockpile #2 and permanently reclaimed spoil area (PRSAI <br />012 Haul fill from PRSA to North Pit haul road truck/loader 1 11.06 $ 3, 744 <br />013 Grade North Pit haulroad fill grader 1 7.10 $ 776 <br />014 Haul topsoil from topsoil stockpile #2 to North Pit haul roatl scraper2 1 3.32 $ 2,193 <br />015 Regrade PRSA to final contour grader [ 3.46 $ 378 <br />016 Regade topsoil stockpile #2 grader 1 2.07 $ 226 <br />017 Revegetate North Pit haul road, footprint of t.s. #2, PRSA revege 1 18.50 $ 6,854 <br />South pit drill pad <br />018 Regrade South Pit drill patl dozer 1 11.29 $ 2,012 <br />019 Haul topsoil from stockpile #2 to South Pit drill pad area screpe2 i 6.39 $ 4,212 <br />020 Finish-grade South pit drill pad grader 1 2.69 $ 294 <br />021 Revegefate 3.5-acre South Pit drill patl revege 1 7.00 $ 2,594 <br />Carbon Junction Canyon channel <br />022 Regrade C.J. Cany. Channel fl 1962'to 922' per TR-12 profile dozer 1 3.08 $ 548 <br />023a Excavate C.J. Canyon channel -hard digging excavate 1 30.88 $ 3,501 <br />023b Excavate C.J. Channel-easy digging excavate 1 28.59 $ 3,242 <br />024 Purchase filter rock and rock dprap for C.J. channel spreadsheet 1 24.00 $ 79,882 <br />025 Install filter and nprep in C.J. Canyon channel excavate 1 173.00 $ 19,617 <br />026 Purchase culvert for C.J. Canyon channel road crossing TR-12 est. i 8.00 $ 9,903 <br />027 Install culvert where channel crosses roatl TR-12 est. 1 24.00 $ 7,000 <br />028 Surveying TR-12 est. 1 16.00 $ 4,500 <br />Sediment p ond #2 <br />031a Haul topsoil for fill & reveg. f/ stockpile #7 to pond #2 truck loader 1 31.27 $ 7,055 <br />031b Regrade pond #2 fill tlozer 1 7.86 $ 1,400 <br />031c Install riprep in drainage channel at pond #2 truclNOader 1 0.18 $ 600 <br />031 d Revegetate pontl #2 revege 1 1.28 $ 517 <br />Sediment p ond #1 <br />037a Backfill pond #1 with topsoil f/ stockpile #8 scraper 1 78.22 $ 24,349 <br />037b Regrade pond #l backfill dozer 1 35.63 $ 6,346 <br />037c Revegetate pond #1 revege 1 5.80 $ 2,341 <br /> <br /> SUBTO TAL (THIS PAGE) 119.65 $ 418,289 <br /> <br />