Laserfiche WebLink
• -q- • <br />page 6, references Soil Conservation Service recommendations. These <br />have not been presented (indicated as attached). Amore specific <br />reclamation plan time~Eable should be supplied. This plan should <br />include the dates (by year) that each phase of reclamation will occur. <br />Yes anitia~ <br />(i.e. grading, researc-hiag-, etc.) The reclamation plan map should- <br />show the rerouted creek, In addition, more specific information is ~ <br />needed concerning how natural drainages will be maintained. For <br />instance, what is the configuration of re-established drainages? What <br />is the slope of existing and final drainages? How will you deal with <br />nick points? What are current capacities of the drainages? What will <br />the final capacity be? What materials will the drainages be constructed/ <br />of? <br />More specific information is required concerning the concrete quarry. <br />It is rather ambiguous throughout the mining and reclamation plan. <br />Specific details for this area have not been provided. A reclamation <br />plan map has not been provided as required. <br />VI. Exhibit J - Vegetation Information <br />Part a, as required by the Rules and Regulations, must be submitted. <br />The Soil Conservation Service can provide this information. <br />VII. Exhibit K - Climate <br />Temperature ranges should be added to this exhibit. <br />VIII. Exhibit L - Reclamation Costs <br />In accordance with Exhibit L of the Rules and Regulations, an estimate <br />of all costs involved with the reclamation process must be submitted. <br />For more specific detail on what is required, see Exhibit L, page 19 <br />of the Rules and Regulations. <br />Vi V. Exhibit M <br />It appears that Fremont County approval does not include the east <br />