Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM ~'~ <br />Pond /~~ Go IoL~Pti ~-,.4-c~ ll° ~ NPDES No. END S~ <br />~. Date of Inspection ~~Z~fTI'~ <br />OcJt ~ ~ Se/z r/r e e <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: cell Moderate, Few, Poor <br />2. Erosion loaning gullies: Extensive, Some, Very F , Hone <br />3. Is wave action causing erosion: • <br />On the upstream embankment? Yes No ~/ <br />• At the principal spillway inlet? Yea, No <br />4. Erosion of the downstream toe of the embnnkment7 Yea No <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yea 1No If yes <br />could this seepage cause potential instability? '[es No <br />Explain: <br />PRINCIPAL SPILLMAY <br />1. Ia the principal apillrray system in working order? Yea No <br />2. is the inlet free of debris and restrictive saterial?Yea~No <br />(' 3. Is the diacharge outlet free of.restrictivs material? Yes / No_ <br />t 4. Is erosion occurring at the diacharge outlet? Yea__No~f <br />yes, <br />evaluate the severity: Extenalva. Moderate Just starting None <br />EMERGENCY SPILLMAY ' <br />1. Is the overall emergency apillwa ayatem capable o!'. passing <br />design storm diacharge? Yas Mo <br />2. Does 1t appear <br />since the last <br />3. Is erosion occ <br />Yea Ho~ <br />extent <br />as i! the emergency'ap111w has die;charged water <br />inspection? Yea Ho <br />Erinq at any section of the emergency spillway? <br />_ Describe the <br />1. Hae the design orage capacity <br />Yee No If yes, <br />explain: <br />of the reservoir been aurpaesed7 <br />C Please add any special comments concerning potentiall ~ ~ng~e <br />problems on the back of this sheet. <br />Inspector ' <br />