Laserfiche WebLink
BASIN RESOURCES, INC. - <br />SEDIMENTATION POND INSPECTION FORM <br />Pond Go (cQe,y L~1fe. le NPDES No._OU <br />Date of Inspection 9 Z 9~~~ 3 <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: CF.xce_~ lle , Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, Very Few, None\ <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yea• No V <br />At the principal spillway inlet? Yes No~_ <br />4. Erosion of the downstream toe of the ea:bnnkment? Yes No~_ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yea No /If yes <br />could this seepage cause potential instability? Yes No <br />Explain: <br />PRINCIPAL SPILLWAY <br />1. is the principal spillway system in working order? Yea No <br />2. Is the inlet free of debris and restrictive material?Yes <br />C 3. Ia the discharge outlet free of ~reatrictive material? Yea / No_ <br />4. Is erosion occurring at the discharge outlet? Yes_ No ~ If <br />yes, <br />evaluate the severity: Extensive. Moderete Juat starting Hone <br />EMERGENCY SPILLNAY <br />1. Is the overall emergency spillwa:fi system capable of passing <br />design atozzn discharge? Yes ~~ __No <br />2. Does it appear as if the emergency'apill has dia~charged water <br />since the last napection? Yes No~ <br />3. is erosion oc~ing at any section o! the emergency spillway? <br />Yea No // Describe the <br />extent <br />DI E <br />1. Sae the deai storage capacity of the reservoir been surpassed? <br />Yes No If yes, <br />explain• <br />~ Please add eny special comments concerning potentiell geroua <br />problems on the back of this sheet. /~J <br />inapecto ~ <br />