My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68753
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68753
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:20 PM
Creation date
11/20/2007 10:32:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000018
IBM Index Class Name
Permit File
Doc Date
4/20/2000
Doc Name
RESPONSE TO 2ND ADEQUACY REVIEW MUNSCH PIT M-2000-018
From
CHEYENNE CNTY COMMISSIONERS
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT C <br />MINING PLAN <br />Mining Plan <br />(a) Mining of the sand and gravel deposit is scheduled to commence <br />approximately February 1, 2000 and end approximately February 1, <br />2010. <br />(b). Topsoil depth is approximately 5" which is dark grayish brown loam. <br />Topsoil will be stripped and stockpiled from the active mining area. Sloping <br />of this stockpile will be no steeper than 3H:1 V and the slopes will be <br />mulched with straw to prevent wind and water erosion. Operator will also <br />seed stockpiles with a suitable cover crop to minimize weed production. <br />Topsoil stockpiling will be approximately 2,000 cu/yds. The topsoil <br />stockpiles will be located the SE corner of the pit. <br />(c) The subsoil is brown clay loam to 25" below that is brown, calcareous <br />clay loam. This overburden will be separately stockpiled in the manner <br />above (b). <br />(d) Thickness of the sand and gravel deposit is substantial ranging up to 72" <br />in depth. <br />(e) An access road will be built off of C.R. M. There will be no structures <br />erected. Sand and gravel material may be stockpiled or loaded directly <br />on county trucks for use on county roads. <br />(fl The pit will be operated as an open pit. There will be no improvements <br />and material stockpile dimensions will be determined to facilitate 3H:1 V. <br />Active pit area will be approximately 1 acre in size, roughly 200 z 200'. <br />After we mine an acre then we'll move north and mine another acre and <br />start reclaiming the mined out area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.