Laserfiche WebLink
loaded 50 ton haul trucks. The road is constructed entirely with railroad ballast. The rough and <br />interlocking nature of the ballast makes it ideal as a road base and surface. The ballast surface <br />also contributes little to no sediment run-off when faced with a precipitation event. The road cuts <br />are laid back to greater than 1.5:1. If the area is not reclaimed before this fall, the disturbed, non- <br />surfaced areas will be seeded to help stabilize them until they are reclaimed. <br />Based on these observations, calculations and inspections the Temporary Truck Dump and Lay- <br />down area, I can certify that the Sediment Basin and Haul Road are in reasonable compliance with <br />the applicable sections of the CMLRB regulations and the approved permit documents, <br />(M.R.101), <br />Best Regards, <br />_ : William ~ i,epro, P.E. <br />=, ;- :Colo:Registered Professional Engineer <br />~':. •`;30363. " <br />xc: JeffDubbert <br />Murari Shrestha <br />Gordon Bell <br />