Laserfiche WebLink
~ ^ <br />•'v Li revels ac9 Geology <br />t.. ~i:': .. ::".U!LD02EI. YORK <br />Task #: 1 Prep. by: BK Tesk File Neme: M081-1 <br />• Date: 10/28/96 Permit #:N-96-081 Mine: Bad Boys Pit <br />Permit Action: NE4 PERMIT <br />Task Description: BACK FILLING OF PIT <br />HOURLY EGUI PMENT COST <br />_________ ___________ Basic Machine: Cat DBN Horsepower: 285 <br />Blade Type: UNIVERSAL --------- <br />Attachment #1: ROPS Cab Shift Basis: 1/day <br />pttechment #2: t-shank ripper --------- <br />Cost Breakdown: <br />-------------- Utilization X <br />Ownership cost/hr = 546.62 N/A <br />Operating 8 overhaul cost/h r- dozer = f51.93 100 <br />-ripper = f3.95 50 <br />Operator cost/hr = f22.95 N/A <br />Total egpt. unit cost/hr = f125.44 iotel fleet cost/hr; (125.44 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 27,777.0 8CY Factor: 1.430 Volume: 39,721.1 LCY <br />Source of quantity take-off: PAGE 11 <br />Source of est. swell factor: PAGE 11 <br />HOURLY PRODUCTION <br />_________________ Job Condition Correct ion Factors <br />Avg. push distance: 50 ft. _____________________ ___________ <br />- -------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.70 (Cat tbl) <br />dozer production: 1593 LCY/hr Dozing method..... 1.00 (gen.) <br />- -------- Visibility........ 1.00 (avg.) <br />Naterial consistency: Job efficiency.... 0.83 (1sh/day) <br />Roek, avg. ripped or blasted Spoil pile factor. 0.80 (fnd-rf) <br />------------------- -------- -------- Push gradient..... 1.02 (Cat tbl) <br />pvg, push gradient: 1.00 X (nag) plti code deretion. 1.00 (Cat tbl) <br />- -------- Naterial weight... 0.70 (Cat tbl) <br />Avg. site altitude: 9000 ft. Blade type........ 1.00 (S,SU, U) <br />Materiel weight 3300.00 lb/LCY Net Job Correction 0.25 <br />Met. Descr.: - -------- ----------- <br />Decomposed rock - 75X Rock, 25X Earth Adjusted Unit Prod.: 395.71 LCY/hr <br /> Adjusted Fleet Production: 395.71 LCY/hr <br />JOB COST ----------- <br />Fleet size 1 Dozers) Total Job Time: 100.38 Hours <br />Unit Cost 50.317 /LCY Total Job Cost: E12, 591.68 <br />