Laserfiche WebLink
.•. <br />~, <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description ~ Cost (S) <br />______._I__~_______________________________________________I__________.. <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description <br />M. NISCEI LANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Subtotal (K ): <br />Cost (S) <br />Subtotal (L): <br />Cost (f) <br />Demolition <br />3 ~ Seeding ~ fb34 <br />Fencing <br />4 ~ Mob/Demob 1 d 8n dozer ~ f500 <br />Subtotal (A ): 51,869 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E16,795 <br />Subtotal (M): 51,134 <br />TDTAL DIRECT RECLAMATION COSTS (subtotals A through M); f14,926 <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (f) <br />_______.I._.._______________.._________.__________.._________I____________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 5231 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ E146 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f1,493 <br />4. ~ Job Superintendent.. <br />8. DMG PROJECT ADNINI STRATTON EXPENSES <br />Item No.~ Item Description ~ Cost (S) <br />__..____I__________________________________________________I____________ <br />1. ~ Minerals Program Admin. Fee e[ 5.00% of cntr.~ f840 <br />NET INDIRECT COST PERCENTgGE: 18.15% Subtotal (B): 5840 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B); 52,709 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 517,635 <br />