Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />Basin Resources, Inc. <br />Quarterly Inspection Report and Annual Certification <br />Sedimentation Ponds <br />Rules 4.05.6(13) and 4.05.9(13) <br />Mine: Golden Faele Mine <br />Date and Weather. 29 March 1994, snowine, cold <br />Sedimentation Pond No: 003 <br />Generrl Description or Reference to Site Plan: <br />Golden Eagle Mine -Permit No. 0-81-013: Map 11; Exhibit 18, Pages 11 and 12. <br />Activity During Inspection: <br />Routine operation; water in the pond at an elevation of 7111.5 feet, not discharging. <br />EMBANKMENT: <br />1. Evaluation o[ the adequacy of the vegetative cover: Excellent, Moderate, Spotty, Poor. <br />Moderate. There were no trees taking root on the embankment. The pond is fenced to limit access from <br />grazing animals. _ <br />2. Are erosion-formed gullies present? Extensive, Some, Very Few, None. <br />None. <br />3. Is wave action causing erosion: 1) on the upstream embankment? Yes _ No X . 2) at the principal <br />spillway inlet? Yes _ No X . <br />4. TS the downstream tce of the embankment being eroded? Yes ` No X The rouse of erosion is <br />attributed to: Explain. <br />5. Is seepage occurring through the dam? Yes _ No X . [f yes could this seepage potentially rouse <br />slope ins ability? Yes _ No _ Explain <br />PRINCIPAL SPILLWAY <br />1. TS the overall spillway system in good working order? Yes X No _ <br />2. Is the inlet (free of debris or other restrictive materials)? Yes X No _ <br />3. Is the discharge outlet free of debris or other restrictive materials? Yes _ No X . <br />The discharge outlet was free of debris, but a sliding gate valve at the outfall was in the closed position. <br />Goltlen Eagle Mine Sedimenfafion Pond 003, 29 March 94, Page f of 3 Pages <br />