Laserfiche WebLink
• 3. Spread and ~r-epare 13C) yd3 of topsoil i_r seeding. <br />130J ::i3 x 1 hr./1703 yd3 x 5111.73/hr. = 5::5.G-'. <br />4. Seed area of disturbance. <br />700 ft. x 50 ft./x3,560 ft3/acre x 5317/acre 5254.71 <br />Potential additional bond = $1253.04 or 51260.00. <br />The additional 51250 brings the Colo~~yo bond amount to `•4,323,776. <br />Colo•vyo has provided a bond for 54,500,000 so no additional bond is needed. <br />• <br /> <br /> <br />