My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68157
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:49 PM
Creation date
11/20/2007 10:14:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
8/19/2002
Doc Name
Replaces Old
Section_Exhibit Name
Exhibit 25 Hydrologic Monitoring Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Data Processina and Reoortina <br />1. Copies of the field and laboratory data sheets will be sent <br />quarterly to the CMLRD. <br />2. Data will be summarized in the annual hydrology report to <br />CMLRD. <br />IV. In-Mine Monitorina <br />A. Monitorina Locations - points of water inflow within active <br />mine workings. <br />B. SamDlina Freauencv <br />1. A semi-annual survey of water inflow to the mine will be <br />conducted. <br />2. Estimate of the quantity of each source will be made. <br />3. Field water quality parameters (pH, electrical <br />conductivity and temperature) will be measured for all <br />significant inflows. <br />4. Locations of all inflows will be recorded on a mine <br />workings map. <br />C. Samnlina Procedure <br />1. The following information will be provided on each sample <br />bottle label: <br />- Station/Well designation <br />- Date and time <br />- Bottle number <br />- Analysis code <br />- Individuals initials <br />2. Samples will be collected in such a manner as to minimize <br />physical disturbance at the sample point. <br />3. Sampling devices will be cleaned prior to use and samples <br />will be placed in clean sample containers which will be <br />sealed at the sampling site. <br />4. Samples will be placed in a cooler with ice immediately <br />after collection and will be shipped within 24 hours to a <br />laboratory for analysis. <br />D. Data Processina and Reoortina <br />A table keyed to the mine map will be prepared which depicts <br />quantity and quality of inflows. Attempts will be made to <br />correlate inflow with geologic structure. These data will be <br />incorporated into the annual hydrology report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.