My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28973
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:02 PM
Creation date
11/20/2007 10:10:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Hydrology
Doc Name
ROATCAP CREEK MONITORING REPORT
Permit Index Doc Type
OTHER SURFACE WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c~RUs <br />Orchard Valley <br /> <br />Cyprus Orchard Valley Mine <br />P. O. Box 1299 <br />Paonia, CO 81428 <br />P hone: 303-527-4135 <br />Fax: 303-527-223a <br />October 31, 1990 <br />Ms. Susan McCannon, Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />RE: NOTICE OF DISCHARGE EXCEEDING N.P.D.E.S. PARAMETERS (DISCHARGE <br />POINTS 001. 0051 <br />Dear Ms. McCannon, <br />Attached, please find the discharge monitoring reports (DNB's) for <br />point 001 through 006 for the period of July 1, 1990 through <br />September 30, 1990. The DMR's indicate that an exceedance occurred <br />at point 001 during this period. The specifics of the exceedance <br />will be discussed below. <br />POINT 001 - the monthly average for fecal coliforms is reported at <br />6,250/100 ml, and the permit requires 2,000/100 ml. This number is <br />reflective of the number of coliforms reported during the July <br />sampling. The reported results for this quarter are as follows: <br />July - 18,750/100 ml, August and September - 0/100 ml. This <br />resulted from the break down of the chlorinator injector unit. <br />Thus, not enough chlorine was being metered into the effluent <br />water. <br />ACTION TAKEN <br />Chlorine was hand fed into the effluent water, until replacement <br />parts could be obtained to correct the feed problem of the <br />chlorinator. The chlorinator has been repaired and is functioning <br />properly. <br />ADDITIONAL INFORMATION <br />The effluent discharge from the plant goes directly to a holding <br />pond, and no discharge occurred from the pond which would enter <br />State waters. <br />POINT 005 - On September 18, 1990, a severe rain storm occurred in <br />the are, and as a result of the storm, the dam embankment breached. <br />It was planned to obtain a sample of the effluent resulting from <br />this storm but the breached embankment did not allow for this. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.