Laserfiche WebLink
<br />RECEIVED. <br />TO: Jim Herron <br />Reclamation Specialist JANoa };,?~ <br />Mined Land Reclamation <br />423 Centennial Boulevard M1NFD LAND RECEAMATtONiCOAC <br />1313 Sherman Street COED. DF/j, OF NAiURA1 RESOURCES . <br />Denver, CO 80203 <br />SUBJECT: Completion and Engineers Certification <br />~ Northern Coal Company Refuse Facility <br />ME - 8310-11-1/26 <br />We the undersi~7ned as Inapccti.r,g Rnginecrs on the above <br />stated project do hereby certify that the project as <br />described in the following phase descriptions was completed <br />! in very close compliance with the approved construction <br />plans of the same identifing number ME - 8310-11-1/26 <br />~ ITEM I: Clearing, Grubbing and Topsoil Stockpiling <br />I <br />Topsoil was adequately removed from all areas designated <br />on Figure 13.2.4 to a depth in some locations of forty <br />eight inches (48"). Excess topsoil not necessary to re- <br />' cover embankments and cut slopes was stockpiled left of <br />Sta 12+00 and left o.f Sta 22+90 to he used for future <br />covering of the Refuse pile. <br />I <br />All topsoil removal areas were inspected for absence of <br />organic material and plant life, prior to base of fill <br />compaction and construction of embankments. <br />~ i <br />'. ." . r'' f . / . <br />/ r ,~ r' <br />r / ' <br />~6 r <br />