My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67901
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:34 PM
Creation date
11/20/2007 10:07:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
Permit File
Doc Date
6/22/2000
Doc Name
112 PERMIT REVISIONS FOR MONUMENT VIEW GRAVEL PIT PER STATE COMMENTS 6-16-2000
From
RG CONSULTING ENGINEERS INC
To
MESA COUNTY CLERK/RECORDER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Recision p 1 -Page 7 nl 70 <br />A 10-ft to 20-ft lens of sand ,gravel and cobble ma[erial is located under the overburden material <br />described above. This material will be extracted and processed. In general, the upper portion of <br />this lens contains more fine-gained sand ma[erial. Cobbles within the lens are anticipated to <br />range in size upto sixteen inches in diameter. <br />Below the sand and gavel lens is weathered silty clay Mancos Shale, which is considered bedrock <br />in this portion of Mesa County. Mancos Shale is a dark gray-to-gray block, thin-bedded to <br />laminated shale with interbeds of siltstone and sandstone. <br />(gl ldenr~ the primary and secondary commodrties to be mined/eztracled and describe the intended use: <br />The primary commodities are sand and gravel which will be used for construction materials. <br />Secondary commodities consist of the overburden soils, which will be used, along with additional <br />inert imported materials, for backftll to reclaim the project site. Overburden soil may also be <br />needed for'`fines" to produce the road base materials. <br />(h) Name and describe the Intended use ojall expected incidental products to be mined/extracled b}~ the <br />proposed operation. <br />Incidental produce mined from the site consist of overburden soils which will be used primarily <br />for site backtill / reclama[ion. Overburden soil may also be required for "fines" to produce road <br />base materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.