Laserfiche WebLink
<br />Ms. Ann Hodgson <br />bctober 30, 1960 <br />Page Four <br />to the planned homesites should be sloped at 5:1 fora distance out Into <br />the lake to accaeodete such awimming acilvitles. <br />2. Topsoil and revegetatlon should be planned for all shores of the two lakes. <br />,I Your stateoMnt that, "Topsotl.wiil be replaced on the shores where feaalbls <br />V ..." Is not acceptable In this regard. What is the planned final depth of <br />topsoilT <br />Exhibit F <br />J Although the cross section Is labeled wrrectly, there is an error en the <br />normal -wter level In the parcel B lake in the upper right hand corner of <br />page 22. I will correct this error it you so Instruct me. <br />Exhibit G <br />1. Mater un be expected to be removed and hauled away with the product when <br />the material is mined wet. This is a consumptive use of water end will <br />require an industrial water right. Please quantify this use and clarify <br />the water right Involved. <br />J 2. Please send the Division a wpy of the NPOES permit appllutlon for this <br />operation and notiflcatton when it Is approved. <br />J3• 1 have not yet received the review of this proposed operation tram the <br />Division of Water Resources but will psss it on to you when I do. <br />Exhibit H <br />J 1. I have received the review of this proposed operation from tfie Division <br />of Mildllfe and have enclosed a copy. In general, most of their comments <br />parAllel mine. <br />2. If these lakes are to have any wildlife use, the presence of shoreline <br />Irregularities and/or Islands poutd b• valuable. <br /><ry3. Cottonwood trees presently on the site are mentioned. Are any of theca <br />trees to be left In final recl,amatlonT Are any other trees to be planted <br />around the perlmeteY of the 1akeT Such trees would ba val cable both for <br />aesthetic reasons (in connection with planned future development) end for <br />wlldl~ifs use. <br />Exhibit I <br />J Please send the Division the completed soils analysis mentioned in the appli- <br />cation. <br />Exhibit L <br />,]1. Does the 57 acre figure given In these costs reflect the entire backfllled <br />area and all lake shores? <br />J 2. Since backFilling of two areas Is part of the raclametlon plan, the equip- <br />ment costs should be Included for this activity, or the activity should <br />be otherwise explained. <br />J 3. Where does the $10,000.00 leveling and grading cost orlglnateT How many <br />cubic yards and acres is It basod upon? <br />