Laserfiche WebLink
:, <br />,% ~> <br />4.) The as built weir approximates the design dimensions as <br />shown in the Appendix. Per conversation with Bob Heaver, <br />the structure is reported to be reinforeced. Field measur- <br />ments are for the exposed sections of the weir only. <br />5.) The four (4) inch drain pipe is installed and functional. <br />Both ends are clear and some evidence of discharge was <br />present in the ripranped area. <br />6.) F. M. Fox personnel were present during construction and <br />verified the use of 8 inch fill lifts compacted to 907 of <br />the maximum dry density. <br />7.) All fill outslopes have been revegetated with grasses. <br />In sw~~.mary, the information gathered and the observations made <br />during the field inspection indicate that the sedimentation pond <br />~•:as built to the desio specifications and in a workmanlike manner. <br />i+7incon Inc. appreciates this opportunity to vrork with rr^ox Consultants <br />on this project. V1e would be pleased to discuss this report with <br />you at your con:~enience. <br />S ir.cerely, <br />~':incon In r_. , P. C. <br />t4illiam P. Eala2, P.E. <br />President <br />Colorado P. E. No. 17129 <br />(2 ) <br />