Laserfiche WebLink
• <br /> <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />N. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ___--~ Cost (8) <br />________I______________~_____________________________., I..___________ <br />12 ~ Reconstruct Drainage ~ $1,218 <br />Subtotal (H): 81,218 <br />I. EARTHWORK DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (8) <br />________I_____________________________,.____________________~____________ <br />13 ~ REMOVE POND 9 ~ 86,897 <br />14 ~ Remove Diversion Ditches ~ 8479 <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal CI ): 87,376 <br /> <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />_______I_____________.,_______~____________________. <br />18 ~ REPLACE TOPSOIL ON FACILITIES AREA <br />Haul Roads <br />16 ~ Replace Topsoil on Final Pit Area <br />30 ~ REMOVE/REPLACE TOPSOIL FROM BORROW TO PIT <br />Cost (8) <br />I___________ <br />~ 840,841 <br />~ 884,613 <br />~ 820,007 <br />Subtotal (J): 8145,461 <br />