Laserfiche WebLink
RECLAMATION COST SUMMARY con['d <br />sheet 2 of 4 <br /> D. <br />Task <br />_____ EARTHWORK - FILL COMPACTION <br />No.~ --__-___ Task Description ~ <br />__.. <br />_________ <br />__________________ <br />Cost (5) <br /> I <br />______ <br />____I_ <br />N/A _______ <br /> Subtotal (D ): <br /> <br />E. _ <br />EARTHWORK - RIPPING ___________ <br /> Task No.~ Task Descri pii on ~ Cost (5) <br /> _____ ___I______..___________________________________________I_ <br />6 ~ Rip Regraded Spoil Prior to Topsoil Replacement ~ ___________ <br />55,617 <br /> 7 ~ Rip Haul Road Material 3'Deep ~ 54,594 <br /> 8 ~ Rip Facility Area ~' 58,482 <br /> 25 ~ Rip Perimeter Road Material 3'Deep ~ 52,474 <br />Subtotal (E): 521,167 <br />F. EARTHWORK - ROAD RECLAMATION <br />• Task No.~ _ Task Description- <br />________I________________ ____________ <br />9 ~ Remove Ripped Surfacing Material 8 Haul to Pit <br />10 ~ REMOVE 2700/88 ROAD DETOUR <br />10b ~ REPLACE BB-RA00 WITH PAVEMENT <br />26 ~ Remove Ripped Material from Perimeter Road 8 Haul <br />Cost (5) <br />521,387 <br />545,500 <br />5119,375 <br />527,183 <br />Subtotal (F) 5213,445 <br />G. EARTHWORK - FINISH GRADING <br />Task No.~ Task Description <br />11 ~ FINAL GRADE DISTURBED AREA <br />~ Cost (5) <br />~ 55,932 <br />~ - <br />Subtotal (G): 85,932 <br />