Laserfiche WebLink
Table No.1 <br />Weld County <br />gust Control Well #1 <br /> <br />Month Dust <br />.Control Well #1 <br />Pumping <br />(acre-feet) <br />A) Lagged <br />Stream <br />Depletions <br />(acre-feet) <br />e Replacements <br />from City of Greeley <br />WWl'P <br />(acre-feet) <br />C) <br />Jan-05 <br />Feb-05 <br />Mar-05 6.25 5.12 5.12 <br />A r-05 6.25 5.87 5.87 <br />Ma -05 6.25 6.08 6.08 <br />Jun-05 6.25 6.18 6.18 <br />Jul-05 6.25 6.22 6.22 <br />Au -05 6:25 6.24 6.24 <br />Se 05 .6.25 6.24 6.24 <br />Oct-05 6.25 6.25 6.25 <br />Nov-05 6.25 6.25 6.25 <br />Dec-05 6.25 6.25 6.25 <br />.Jan-06 6.25 6.25 6.25 <br />Feb-06 6.25 6.25 6.25 <br />Mar-06 6.25 6.25 6.25 <br />A r-06 6.25 6.25 6.25 <br />Ma -06 6.25 6.25 6.25 <br />Jun-06 6.25 6.25 6.25 <br />Jul-06 6.25 6.25 6.25 <br />Au -06 625 6.25 6.25 <br />Se -06 6.25 6,25 6.25 <br />Oct-06 625 6.25 6.25 <br />Nov-06 6.25 6.25 6.25 , <br />Dec-06 6.25 6,25 625 <br />Total .137.50 135.69 135.69 . <br />(A) Projected pumping from Weld County Dust Control Well #1, assumed 100°~ consumptive <br />(B) Lagged stream depletions from alluvial aquffer model with parameters: - <br />Pumping Well to River = 275 ft <br />Transmissivity = 120,000 gaUday/ft <br />Specific Yield = 0.2 <br />Distance from River to Impermeable Boundary = 2,700 ft <br />(C) Replacements from reusable effluent from City of Greeley <br />