Laserfiche WebLink
PART I <br />Page No. 10 <br />Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Stormwater Management Plan (SWNIPI (continued) <br />t) Emolovee Education <br />The petrnittce shall develop and implement employee education programs to inform personnel at all levels of <br />responsibility of the components and goals of the SWMP. Education should address topics such az spill response, <br />good housekeeping and material rnanagemrnt practices. The permittce shall identify periodic dates for such <br />instruction. <br />3. Monitoring Reouirements <br />In order to obtain an indication of the probable compliance or noncompliance with the effluen[ limitations specified in <br />Part 1.B.1, the permittce shall monitor all effluent parameters a[ the following frequencies. <br />a) Ac[ive Mining Ou[falls <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Weekly Instantaneous <br />or Continuous <br />TSS, mg/P Monthly Grab <br />Total Iron, mg/P Monthly Grab <br />Settleable Solids, mP/P Monthly Grab <br />Oil and Grease, mg/P Weekly Visual <br />pH, s.u. Weekly In-situ <br />Total Dissolved Solids, mg/P Quanerly Grab <br />CO River Basin ONLY <br />Total Phosphorus (az P), mg/P Quarterly Grab <br />Dillon Reservoir and Upper Bear Creek* <br />Drainages Only <br />b) Post-Mining Outfalls <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Monthly Instantaneous <br />or Continuous <br />Settleable Solids, mP1P Monthly Grab <br />Oil and Grease, mg(P Monthly Visual <br />pH, s.u. Monthly In-situ <br />Total Dissolved Solids, mg/P Quanerly Grab <br />CO River Basin ONLY <br />Total Phosphorus (as P), mg/P Quarterly Grab <br />Dillon Reservoir and Upper Bear Crcek* <br />Drainages Only <br />See Part I.C. for Definitions <br />