Laserfiche WebLink
TrucWLoaderTeam Work cont'd Task # : 002 sheet 2 of 2 <br />Loading Tool Cvcle Time : Number of loading tool passes required to fill truck : 4 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : BELOW AVERAGE <br />- selec[etl value within basic rating : AVERAGE <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load <br />NA Maneuver : NA <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, antl dump ) <br />Dump: 0.100 <br />NA minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material: NA NA NA <br />Stockpile : NA NA NA <br />Truck ownership : NA NA NA <br />Operation ; NA NA NA <br />Dump target : NA NA NA <br /> Net Cycle time aOJUSimenl : IyH rnlnules <br /> Adjusted basic cycle time : 0.335 minutes <br />Net load time per truck (bulk of first loader pass completed during truck exchange) : 1.105 minutes <br />Truck Cycle Time <br />Truck exchange time: 0.50 minutes........ Adjusted for site altitude : 0.50 minutes <br />Truck load time: 1.105 minutes........ Adjusted for site altitude : 1.11 minutes <br />Truck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude : 0.80 minutes <br />Truck travel (haul S return) time: <br />Road condition description : Rutted dirt, little maintenance, no water, 2" fire penetration <br />Raul route : <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />feet/minute Travel time ` <br />(minutes) <br />1 250 15.00 5.00 20.00 463 0.58 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return ro ute : Haul time'" : 0.58 <br />f 250 -75.00 5.00 -10.00 3520 0.21 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />' first antl las[segmenis atljustetl for acceleratioMdeceiaration Return time"' 0.21 mlOUteS <br />"time shown incWCes altitutle atllusiment Total truck cycle time : 3.20 minutes <br />Loading tool unit production : 302.80 LCY hour...... Adjusted for job efficiency : 251.33 LCY/hour <br />Truck unit production : 152.06 LCY/hour...... Adjusted for job efficiency : 126.21 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks loader : 2 trucks <br /> Adjusted hourly truck team production : 252.42 LCY/hr <br /> Adjusted hourly single truck/loader team production : 251.33 LCY/hr <br /> Adjusted houdy multiple trucWloader team production : 251.33 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job dme : 112.88 Hours <br />Unit cost : $1.330 /LCY Total job cost : $37,719 <br />