My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67616
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:21 PM
Creation date
11/20/2007 9:58:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001114
IBM Index Class Name
Permit File
Doc Date
2/6/2002
Doc Name
Reclamation cost estimate
From
DMG
To
Loukonen Bros. Stone Company
Section_Exhibit Name
Permit documents
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~i <br />sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br /> Agency or organization name :Colorado Division OI Minerals And Geology <br />Task # : 002 State :Colorado Pennitrob # :M-2001-114 <br />Date : 01/30/2002 County : Larimer Abbreviation :none <br />User: ACS Site :Starks Quarry Filename :M774-002 <br />Permit or other job action :New application, sandstone quarry <br />Task description : Backfill highwall along southwest side o/permit area using rubble <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Truck/loader team -Truck :Generic 8-10 c <br />-Loader:Caf 3228 L <br />Support equipment -Load area : NA <br />-Dump area : Caf D7R - 7SU <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Breakdown • Truck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Gratler Water Truck <br />Import data filename : truck2 excavate NA dozer NA NA <br />%Utilization-machine ~ 99 100 NA 100 NA NA <br />-Ripper attachment : NA NA NA 30 NA NA <br />Ownership cosVhour: $12.57 $38.17 NA $43.32 NA NA <br />Operating cosVhour: $78.63 $35.63 NA $49.44 NA NA <br />Ripper op. coSVhour : NA NA NA $1.82 NA NA <br />Operator cosUhour : $23.61 $28.18 NA $2799 NA NA <br />Unit subtotals : $54.81 $101.98 NA $122.57 NA NA <br />Number of units : 2 1 0 1 0 0 <br />Group subtotals : Work : $271.59 Support : $122.57 Maintenance : $0.00 <br />Total work team cosUhour : $334.76 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 21,250 CCY factor : 1.335 volume : 28,369 LCY <br />Source of quantity take-aft :see notes <br />Source of estimated swell factor :CIRCES spreadsheet swell table -sandstone <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Caoaciri <br />Truck Payload (weight) Basis <br />Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 8.00 LGY <br />Descr.:Sandstone Heapetl volume : 70.00 LCY <br />Rated payload : 22,000 pounds Average volume : 9.00 LCY <br />Payload capacity : 8.63 LCY Adjusted capacity : 8.63 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 8.10 LCY <br />Loading Tool Caoaciri <br />Rated capacity (nom. heaped) : 3.000 LCY <br />Descr.: Blasted rock -poorly blasted (60 - 75% <br />Bucket fill factor : 0.675 <br />Adjusted bucket capacity : 2025 LCY <br />Site altitude (ft.) : 5,450 <br />Loader Source <br />1.000 (Cat HB <br />Job effciency : 0.830 0.830 <br />Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.