My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE67480
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE67480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:14 PM
Creation date
11/20/2007 9:53:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984076
IBM Index Class Name
Permit File
Doc Date
4/23/1984
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />t <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br />l~ <br />1 <br />1 <br />SPECIES <br />Western Wheatgrass <br />Blue Grama <br />Prairie Sandreed <br />Little Bluestem <br />RATE <br />NPLS/ACRE <br />4.8 <br />.9 <br />1.3 <br />1.4 <br />TOTAL 8.4 <br />After the seed is drilled or broadcast, the area will be fertilized <br />with 40 pounds/acre each of available nitrogen and available phosphorous. <br />The area will then be spread with 4,000 lbs/acre of straw mulch. This <br />mulch will be crimped to a depth of 3 inches into the soil with a <br />straight disc. All drilling and discing will be done as close to the <br />contour as feasible. <br />No irrigation should be necessary. No grazing will be permitted <br />for at least two years. <br />blonitoring of each newly revegetated area will occur during the <br />growing season to insure the seeding success. If low seeding success <br />is noted, reseeding will be done in the following year. Nutritional <br />deficiencies will also be checked, and if necessary, appropriate <br />fertilizers or other soil amendments and conditioners will be added. <br />Reclamation Timetable. The reclamation phases may be correlated <br />to Map Exhibits D-1 and F. The numbering of the reclamation phases <br />correspond to the numbering of the mining stages. The reclamation of <br />each phase will be completed within 5 years from the time mining in that <br />stage is finished. <br />-15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.