Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Stage 1B is located in an area where normal precipitation runoff <br />passes across the area to be mined. In order to eliminate water <br />collecting in the Stage 1B mining area, small diversion ditches will <br />be created to carry the water around the working area and into the <br />primary drainage course to the southeast. In Stage lA surface water <br />will move east to west. Small diversion ditches will be used to move <br />the normal flow away from the working area and into its usual runoff <br />pattern. <br />MINING TIMETABLE <br />The following timetable is based on a projected estimate of future <br />demand. Any economic change from the norm can and will change the <br />timetable estimates. <br /> MINING TIMETABLE <br /> Estimated Acres + <br />STAGE YEARS TOTAL BUFFER DISTURBED <br />lA 20-40 60.0 9.7 50.3 <br />1B 20-40 41.4 15.5 25.9 <br />TOTALS 101.9 25.2 76.2 <br />-9- <br />