My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28780
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:54 PM
Creation date
11/20/2007 9:50:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979195
IBM Index Class Name
Hydrology
Doc Date
2/24/2004
Doc Name
Design Technical Memorandum
From
GEI Consultants, Inc.
To
Denver Water
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HazeltinelROad Runners Rest II/Brinkmann-Woodward Gravel Pits Lining Project -Design Technical Memorandum <br />Denver Water <br />August 2003 <br />Section 1 -Introduction <br />1.1 Purpose and Objective <br />The purposes of this technical memorandum are to present the results of our engineering <br />analyses and basis of design for construction of asoil-bentonite cutoff wall around the <br />combined perimeter of the Hazeltine, Road Runners Rest II, and Brinkmann-Woodward gravel <br />pits in Adams County, Colorado. <br />The objective of the project is to construct a below grade, lined water storage reservoir that <br />meets the State Engineer guidelines for lining criteria for gravel pits. This report presents the <br />results of our seepage and slope stability analyses and our professional conclusions and <br />recommendations regarding lining of the reservoir. <br />1.2 Scope of Work <br />GEI Consultants, lnc.'s (GEI) scope of this work included analysis and design of a soil- <br />bentonite cutoff wall and did not include analysis for long-term operations, water conveyance, <br />or penetrations of the cutoff wall. GEI performed the following services for this phase of the <br />project: <br />1. Evaluated the data collected and described in the Geotechnical Data Technical <br />Memorandum (GEI, 2000) and the Addendum to Geotechnical Data Technical <br />Memorandum (GEI, 2003). <br />2. Performed two-dimensional slope stability analyses of reservoir side slope <br />configurations to support selection of the alignment of the soil-bentonite cutoff wall <br />and to identify areas where slope modifications are necessary. <br />3. Performed two-dimensional seepage analyses to design the depth into bedrock of the <br />soil-bentonite cutoff wall. <br />4. Prepared this technical memorandum (TM) that presents the results of our analyses and <br />basis of design. <br />GEI Consultants, Inc. 1 osoeo o?-o~-n i,~.u~rro,~ri~;,~rm <br />
The URL can be used to link to this page
Your browser does not support the video tag.